The ship requires more than 500kW of power when docking at the terminal, it is recommended to use high voltage shore power (6.6kV 60Hz/6kV, 50Hz);
A cable reel is installed on board of the ship and the cable is sent to the shore through the reel and connected to the shore power box to provide power to the ship.
The longest cable length from ship to shore can be selected according to the actual demand.
Another port mobile high voltage shore power system can be configured. Equipment in container:
★Medium voltage shore power cable winch
★Medium voltage shore power connection cabinet
★Medium voltage transformer
★Low voltage shore power control cabinet
Terminal equipment: medium voltage shore power socket box.